Wednesday, April 27, 2016

SIP wall construction day 1

Today the framers completed stairs ( sort of ) and started putting the SIPs up,  The sort of comment is due to the top two not being in.  Not a big deal.  We ended up switching the run between the landings to be 5 stairs instead of 6.  The math worked out better, but it took some time as the lower landing needed to be raised.  Things may speed up in the next day or so.  The crew had to sort the SIPs today as we just unloaded them onto the upper floor as fast as possible to free up the truck driver and the fork lift, and for each SIP they need to drill out all of the electric chases into the sill plates and splines.

More walls and probably more pics tomorrow.

Looking out the eating noook window
Doorway to the deck.  Watch that step, no deck yet.
Eating nook and deck door from the inside

Electrical chases holes
Stairs going down
Stairs going up