Friday, June 3, 2016

Windows and mechanicals

Progress continues.   Some of the windows are in, the roof is covered with a waterproofing membrane things are dry inside.  The front deck is framed.  The HVAC people have installed the gas line, I'm working on the fresh air and exhaust ducts.  The plumber is about 1/2 done and I'm about 33% done with the electrical.   A bunch of inspections are coming up and then insulation and drywall can begin.


Here are the latest pics.

Front deck framed and a couple of windows are in
Basement bedroom window
Gas line for the boiler



powder bath waste lines
Master bath sinks
Windows from the inside
Recessed lighting in kitchen and island pendant rough in