A quick update.  Painting on the outside and inside is at about 95%, we still have two bathrooms to paint inside and they have a few things to finish up on the outside.   The biggest change is that we have lights.  Over the weekend I wired up most of the switches, and about half the outlets.  Juggling a couple of other items right now, but I hope to have 95% of the electrical done by the end of the weekend.  Yesterday we got internet hooked up.  We did it a bit early because we both work from home and wanted to make sure it's up and working prior to the move.   The HVAC guy is putting in the tankless boiler/water heater today, he connected the gas swing arm yesterday and the gas company is going to set the meter today.  That will be my last utility hookup.   Driveway was suppose to start this week, but I'm having a hard time nailing them down to a time frame.   The concrete floors in the basement will get stained and sealed tomorrow and my interior doors should arrive on Thursday.   A lot of moving parts right now, but things are really starting to come together.  

Here are some pics

Exterior paint nearing completion.  The stack of wood is the Batu for the decking
Basement rec room with working lights.   The floor is getting stained tomorrow
Concrete floor stain test patches.  We are going with the one on the left. 
Exterior paint on the back of the house
Another in progress pic of the paint
Tankless boiler/hotwater heater
Upstairs lights.  Working mini split on the wall and all the hardwood boxes are open for acclimation