Friday, September 16, 2016

Getting closer

We are getting closer to being able to move in.  We have to be in by October 1, due to our landlord selling the place we are renting.   What this means is that we have been focusing on completing the items required to have the permits signed off and a certificate of occupancy issued.   The plan is to complete landscaping, interior trim, interior trim painting, and two bathrooms after we are able to move in.   Having a working bathroom and a kitchen is one of the main requirements, along with having all of the safety feature installed.  Railings, smoke alarms, being the main ones.  We are getting close to getting these items complete and have the last 3 inspections scheduled.  Two are today and the final is next Tuesday.   Here are some current pics.


Kitchen
Downstairs bathroom tub surround, I'm almost done tiling it.

House numbers and railing.  Both required before move in
Driveway
Back deck now with railings.  I'll try to take another angle of this later as it turned out really nice
Front Entry steps.  Railing is almost complete, we are waiting for a part for the porch rail
Interior stairs and railings, wood cap for the upper rail will get installed today.
Kitchen island and sink - need to get this all plumbed this weekend
Oven and Cooktop installed and functional