Wednesday, September 7, 2016

Kitchen, driveway, blower door test

A quick update.   Kitchen cabinets ( Bellmont 1900 ) are almost done, appliances ( KitchenAid Black Stainless ) were delivered, countertop ( Cambria poured quartz ) should be here in about a week.    The driveway got poured.

We had the blower door test yesterday and it tested at 1.5ACH ( Air changes per hour ).   We only needed a 5 so I didn't go around and try to find the leaks.  I have a good idea where a couple are that I want to seal, but that can be a later project as the testing was more than sufficient to pass the state of Washington's Energy requirements.

Here are some pics of some of the changes.

Kitchen Island
Shower pan form for Master bath.  It's one of the Schluter perfab ones, I like them because then you don't have to worry about the slop to the drain being correct.  We don't plan to tile it until after we move in, but needed the drain set up for the blower test.
Kitchen cabinets.   Yes the wine fridge is the first appliance we installed.
More kitchen cabinet pics.

Front stairs are in.  I'll take a pic from the street in a day or so.
My new induction cooktop.  Have to wait for countertops to install
Fridge
Driveway, they poured it over 3 days, and the right side in the pic still needs to dry out a bit.  We are thinking the dark areas will go away after it dries and will match the left.
Front decking is in, just starting on the railing