Tuesday, July 12, 2016

Insulation, Solar, Drywall

Things are progressing.   The insulation crew came out, spray foamed the rim joist, then insulated the garage ceiling and walls, we also had them insulate a few interior walls for sound dampening.  Like the bathrooms, master bedroom, and between the floors

The drywall crew dropped off all the materials and should start hanging tomorrow. This is a day we've been waiting for.

The Solar crew finished putting the panels on the roof and their electrician is close to being done setting up the solar meter and shutoff switch.

Here are the latest pics.

View from the street.  Siding is almost complete, and you can sorta see the solar panels.
Downstairs ceiling insulation between floors, this was also mostly done to reduce noise.
With the low pitch roof it's hard to get a good pic of the panels.

Interior insulation around Master BDR and powder bath, and the drywall is staged.
Garage insulated
Master BDR from the inside.  Mini split on the wall, insulation , drywall staged.  The metal framing on the left is for the pocket door to the closet.
Adding some 10-2 to the electrical panel for Solar.