Thursday, February 25, 2016

The hole is dug

The excavator is done.  Next step is putting in the footings.  That is scheduled to start on Monday the 29th.   Here are some pics.

Looking up the driveway at the big pile.  Feel free to admire the fabulous job done covering the pile.  The primary reason for covering the piles is to keep the city of Anacortes happy, and I really don't want all that soil washing away when it rains.  I'm going to need it for backfill in a few weeks.



This next pic is looking at the step down cuts for the east side of the foundation.   With the slope of the lot the footings for the front of the house need to be cut lower to find undisturbed soil. The first cut is 2 feet and the next one 1 foot.  This means the foundation along the front will be 3 feet higher than the back, and when we backfill inside for the slab that section will need to be filled in.  Thus the big dirt pile.   Watching the excavator figure all this out with their laser level was very educational.



Next pic is looking towards the west at the cut for the step down footing along the front of the house.


Last one is the northwest corner this is the deepest cut.  It's about 7 feet.

Tuesday, February 23, 2016

Day One. February 22nd 2016


The day has finally come.   February 22nd 2016 the excavator ( Catapult out of Sedro Wooley ) showed up and started digging a hole for our new house.  It was pretty exciting.   They graded out the driveway took out a couple of trees and put in a big hole.   Here are some pics.   Next week we move on to footings and foundation.


Cutting the driveway


First cut for the foundation


The hole got bigger.



Tuesday, February 2, 2016

Site prep work. Before digging starts

Here we are.  Groundhog Day 2016.   In 2-3 weeks an excavator is coming to my lot and digging a hole for the new house.  We are fairly excited.   It's been a long planning process and we are ready to start checking things off.

The house will be a daylight basement house with a drive-under garage, and the front door entry on the upper level on the left/West side.  We wanted to have a very energy efficient home and ditched traditional building practices in order to go with a more advanced system.  The daylight basement level will be constructed using Quadlock ICFs.  Combining this with and insulated slab and radiant floor heating the basement should be extremely comfortable and energy efficient.  The main living level will be framed in with SIP ( Structurally Insulated Panels ).   These are basically pre-fab walls, with the main advantage being that you eliminate all of the thermal breaks associated with standard stick frame construction.  The roof will be more standard, but will include a heeled truss in order to allow room for insulation to reach the edges.

So where are we at?   The surveyor has staked the foundation locations, I've installed the temporary electrical panel, and we put a silt fence over the weekend.  Having a small issue loading pics right now, but will get them up soon.

Next week we are headed to St. Thomas for some beach time with friends.   When we return the fun begins.