Here are the latest pics.
pump truck on site to pour some concrete. |
New curb is set |
back deck footings |
deck column forms |
Inside of one of the forms. The pieces of wood on each side are 3/4 inch chamfer board to make the columns more decorative |
The 3 deck columns from above |
Filling the roof post column with concrete |
Upstairs framing nearing completion. This shows the master bedroom on the right, a linen closet straight ahead with the master closet behind it, and the powder bath to the left |
Dining room |