Here are the latest pics.
| pump truck on site to pour some concrete. |
| New curb is set |
| back deck footings |
| deck column forms |
| Inside of one of the forms. The pieces of wood on each side are 3/4 inch chamfer board to make the columns more decorative |
| The 3 deck columns from above |
| Filling the roof post column with concrete |
| Upstairs framing nearing completion. This shows the master bedroom on the right, a linen closet straight ahead with the master closet behind it, and the powder bath to the left |
| Dining room |