Tuesday, May 10, 2016

Deck columns

Today those fancy brackets got put into some concrete.  Allure custom concrete was onsite to do the curb replacement for the driveway and to pour the deck columns.   The framing crew has pretty much wrapped up the interior walls and are starting work on the decks framing, and prepping for siding.  The roof post also needs to be set but that will still be a few days off while the concrete cures.  We had a few materials mix ups today too, but that should all get straightened out tomorrow.

Here are the latest pics.

pump truck on site to pour some concrete.
New curb is set
back deck footings
deck column forms
Inside of one of the forms.  The pieces of wood on each side are 3/4 inch chamfer board to make the columns more decorative
The 3 deck columns from above
Filling the roof post column with concrete
Upstairs framing nearing completion.  This shows the master bedroom on the right, a linen closet straight ahead with the master closet behind it, and the powder bath to the left
Dining room