The framers wrapped up all of the exterior and interior wall framing, along with double checking all of the engineering hardware and having the city sign off on the exterior nailling. They also started prepping the ICFs for siding and framed the back deck. This afternoon they put up the southwest corner roof post and set up scaffolding to place the beams tomorrow.
We've been keeping busy by back filling all of the deck support post footing holes, and staining and priming deck materials. Here are some of the latest pics.
Finished deck support pier with the bracket in place. The brackets were set in the concrete when it was wet. |
Another pier |
The line up of deck piers |
Roof support pier with the 6x6 post put up. |
Scaffolding and the post waiting for the beams |
Back of the house, getting closer to being ready for siding |
Back deck |