Tuesday, May 3, 2016

SIPs are up. Backfill started

Today the framers finished up the SIP construction.   This means that all of the exterior walls are up.  They will begin the upper floor interior walls tomorrow.   Our excavator came out today and did a big chunk of the back fill.  Tomorrow he'll finish closing up the trench and fine tuning things closer to the house, and in the front yard.   The changes today were fairly dramatic, probably the biggest change since day 1.

On another note my deck brackets are now complete.  I'll pick them up tomorrow and see when I can get the posts poured, so that roof construction may be scheduled.

Southwest corner
Backyard
Grade going up to front door.  Need to figure out these stairs
North wall
Looking at the West wall from the inside
South wall